Waterworks Road Relocation project halfway done

News

Evansville Water and Sewer Utility

EVANSVILLE, Ind. (WEHT) – The Waterworks Road Relocation project in Evansville is about halfway done.
That’s according to the Evansville Water and Sewer Utility.
A new water pumping station will be installed in the area, and a water line is being replaced.
A new road and intersection at Veterans Memorial Parkway is being built to by pass that.
“Also one of the things that they’re building is an adequate shoulder for is some point in the future is part of the Greenway we could extend the walkway around out this direction connecting with the Greenway allowing more biking and walking space,” said Evansville Water and Sewer Utility Director Allen Mounts
Work is expected to be finished this fall, depending on the weather.

Copyright 2019 Nexstar Broadcasting, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.